I’m pulling for Monday. Friday’s already mostly a write-off.

  • Mandy@sh.itjust.works
    link
    fedilink
    arrow-up
    6
    arrow-down
    1
    ·
    3 months ago

    If those 4 days also mean 12 hour days, than im not too sure if I’d want thay

    I worked a couple 12 hour shifts before, and they left me even more miserably than work usually did

    • vrek@programming.dev
      link
      fedilink
      English
      arrow-up
      0
      ·
      3 months ago

      Where I work we do a mix… Some 4 days, 10 hrs each, some 5days 8 hrs each.

      Production is typically 4/10 and most other people are 5/8. This allows the other groups a day where production isn’t running and other things can happen, like maintaining equipment and running tests without interfering with production schedules. While not requiring support to come in on a Saturday or Sunday.

      It works out pretty well for us, except when production does ot on Fridays for weeks in a row and the other stuff can’t get done…