EDIT : I’m going to use a Lenovo P500 (at around $130) with 8 threads (will upgrade it later) and 64gb of RAM. It support the E5 v4 family so that’s great. If someone knows the power consumption, that would be cool!
Hello, I want to build a “homelab” and I’m searching for a server, what do you propose me as good options? I need something with at least 64gb RAM, can buy used, and minimum 16vcores… Around 150$ If you have any good options let’s comment below 👇 THX ❤
deleted by creator
Looking for recommendations for a racecar, at least 800 horsepower. Needs to hit 60 mph in under 4 seconds.
My budget is $2000. Please give recommendations.
LOL
deleted by creator
“67 hemi cuda!”
Used HP ProLiant. It’s nearly 10 years old, but has 16 cores 64GB of RAM, and is just under $150 with free shipping
https://www.ebay.com/itm/235286275608
The hidden cost of power usage could be a lot more expensive then something more modern though lol
Agreed. 100% would not recommend going this route for a homelab, but it does meet every specified requirement
Look at my edit do you think it’s better?
https://psref.lenovo.com/syspool/Sys/PDF/ThinkStation/ThinkStation_P500/ThinkStation_P500_Spec.PDF
Got a 490W or 650W PSU. Looks like the CPU is probably around 9-10 years. I’d say probably not much. I bet it’s idling would be around 120-200W depending on # of disks, disk type, and if your using the PCI slots.
For reference I’m running 4 Intel NUC11i7s, $400/unit bare metal, 64GB ram (2x32) $120-$130, and the most expensive part is the flash storage I am buying to fit my needs. Power on these are like 10W idle and max is like 60W each when using turbo.
If they are up for that, I’d be happy to part with mine for cheap. They’d need to get an E5-2650 (v2) to meet their 16 core requirement but a pair of those are pretty cheap.
Xeon E5-2670, with 115W TDP, which means 2x115=230W for the processor alone. with 8 ram modules @ ~3W each, it’ll going to guzzle ~250W when under some loads, while screaming like a jet engine. Assuming $0.12/kwh, that’s $262.8 per year for electricity alone.
Would be great if you have an isolated server room to contain the noise and cheap electricity, but more modern workstation should use at least 1/4 of electricity or even less.
Look at the edit I will maybe take that